News

How is the electric hoist used in conjunction with other construction equipment in industrial building construction?

Publish Time: 2024-12-03
In the grand scene of industrial building construction, the electric hoist, as a key lifting equipment, works closely with other construction equipment and plays an indispensable role.

When hoisting building materials, the electric hoist often works in conjunction with the tower crane. With its large operating radius and lifting capacity, the tower crane is responsible for lifting large quantities of building materials, such as steel bars, formwork, bricks, etc. from the ground surface yard to each construction level of the building. The electric hoist takes advantage of fine lifting on each floor, such as accurately lifting the materials unloaded by the tower crane on the floor to a specific construction location, such as lifting bundles of steel bars to the steel bar processing area, or lifting the formwork to the designated formwork location. Its compact and flexible characteristics enable the efficient secondary transfer of materials within the limited floor space, avoiding the inefficiency and high-intensity labor of manual handling, and greatly improving construction efficiency.

In terms of installing large components, the electric hoist cooperates with cranes, transport vehicles, etc. When large steel structure components or precast concrete components are transported to the construction site, the crane first lifts the components from the transport vehicle and roughly places them near the installation location. At this time, the electric hoist uses the pre-set track or lifting point to accurately adjust the position of the components and install them in place. For example, when installing large steel beams, the electric hoist can fine-tune the height, levelness and angle of the steel beams based on the initial positioning of the crane, so that it can be accurately connected to the column node to ensure the stability and installation accuracy of the entire structure.

In addition, the electric hoist is also used in conjunction with scaffolding, hanging baskets and other equipment. During the construction of the building facade, the electric hoist can be used to lift the hanging basket, allowing construction workers to perform exterior wall decoration, curtain wall installation and other operations at different heights. At the same time, during the construction and dismantling of scaffolding, the electric hoist can assist in lifting scaffolding pipes, fasteners and other materials, speeding up the construction process and reducing labor costs.

In short, electric hoist has shown unique advantages in key links such as lifting building materials and installing large components through tacit cooperation with tower cranes, cranes, transport vehicles, scaffolding and other construction equipment in industrial building construction. It has become a powerful guarantee for the construction of modern industrial buildings and has made important contributions to promoting the efficient, accurate and safe construction of construction projects.
×